2021
2020
- Replaced Roof Stairs on North Tower
- Pool Deck Pavers - Pressure cleaned and sealed
- Repaired Fireproofing on A Garage Steel Beams
- Resurfaced Parking Lot
2020
- Swimming Pool Heating - Installed gas line and gas pool heaters
- Common area Window and Door replacement on B level
- Renovated Front Steps to Plaza Deck
- Plaza Deck Restoration - funded from 2017 Special Assessment. See Contract.
- Tennis Court Renovation
- Exercise Room Improvements - new Saunas and separation walls
- Plaza Deck Railing Repair - completed by R&J in May
- Spectrum Installation and Service Startup - went live on Feb 28th.
- Balcony Restoration - funded from 2017 Special Assessment. In April 2019, the Board approved an R&J Coatings Bid to Repair the Balconies. Owners voted in 2018 to Repair our existing Concrete Railings rather than Replace with aluminum. Balcony railing repair surveys were completed on both towers by CRA. See 2018 CRA Balustrade Repair Project Manual. Balcony floor waterproofing will be part of the balcony railing work as will stucco and painting the underside of 1st floor balcony's and stucco and painting of balcony ceilings where hurricane shutters were removed.
2019
- LED Light Conversion - Total estimated power savings will be ~$6,700 or 11% annually.
- Party Room Windows - completed window replacement
- Engineered Life Safety System Study - completed a building study. Have until 2024 to implement.
- Pool Deck Paver Repair - repaired loose and sunken areas of deck
- Managers Unit - made ready for move in.
- A-Level Pumping System Restoration - restoration completed by A+1 Electric Motors & Pump.
- B-Level Office Renovation - the Bayshore office renovation was completed.
- Fire Alarm Improvement - communication circuit between Fire Alarm and Fire Pump installed by Dynafire.
2018
- Plaza Deck Railing Repair - section of railing replaced by ACE Enterprises. See Picture
- Party Room Renovation - new carpet, baseboards, lights and furniture. See Picture
- B-Level Windows - three new windows were installed by Atlantic Glass. See Picture
- Bayshore Sign - repainted and installed new LED lighting. See Picture
- Balcony Electrical Plug-ins - new plug-ins were installed by Perry Services
- Sauna Room Floor - repair completed by ACE Enterprises.
- LED Light Conversion - completed both garages and part of B-Level.
- Landscaping - a significant amount of landscape work was completed by owners.
- Stair Walls on Pool Deck - ACE Enterprises has repaired and painted these walls
- Irrigation System - new irrigation system installed using SA funds
- Exterior Painting & Repair - Exterior Painting Project Page
- Electrical System relocation from A- Level to B-Level - part of Hurricane Irma repairs
- New Fire Pump - part of Hurricane Irma repairs
2017
- Sliding Glass Door Replacement - 37 Units had Sliding Glass Doors Replaced along with Structural Repair around the doors
- A-Level Elevator Lobbies - new Flooring was installed and steel doors were replaced
- Balcony Ceilings - balcony ceilings were scraped of elastomeric coating and were stuccoed and painted
- B- Level Hallway and Lobby's - new vinyl Flooring was installed and the walls were re-Painted
- Parking Garage Fireproofing - steel beams were cleaned, treated for rust and resprayed with fire retardant
- Parking Garage Exterior Wall Repair - wall cracks and spalling were repaired
- Plaza Deck Work - the seams where the Plaza Deck meets the two building were redone and two deck drains were replaced.
- Managers Unit Renovation - renovated kitchen and all walls & ceilings were re-textured and painted
- Exercise Rooms & B-Level Bathrooms - these areas were renovated
- Swimming Pool Renovation - the swimming pool was resurfaced and new tile and paver ledge installed
- Parking Lot - the asphalt was re-sealed and new parking lines added.
- Garage Fire Sprinklers - the heat detecting sensors and water sprayers were replaced
- North Elevator Renovation - both of the north tower elevators were renovated
- Pool Deck Maintenance - decorative pavers were installed over the existing pool deck
- North Tower Roof - new roof was installed
- South Tower Roof - new roof was installed
- Entrance Sign - replaced with new sign
- Plaza Deck Waterproofing - new waterproofing installed
- Balcony Decks Sealed - new waterproofing installed
- Exterior Painting & Repair - both buildings